Fitting Instructions


All our bespoke gates are made to order. To ensure that we are able to manufacture your gates to fit, please read the following instructions carefully:

  • The size of the gate opening determines the actual size of the gate. The opening is the distance betweenthe existing or new build posts. If you specify posts, we will make allowance from your gap size for theposts. The width of your gate opening should be measured at the top, middle and bottom of the opening(as above). The measurement you provide should be the minimum of these values.
  • The height you specify for your gate is from the ground to the top of the gate. We usually allow for a50mm clearance at the bottom, except if specified differently.
  • For uneven or rising ground requiring a ground clearance of more than 30mm, rising hinges are available(maximum gradient 12°).
  • If you select a gate with an arched or inverted arc design, please specify the lowest point of the arc inthe special instructions field.
  • If the gate is a single opening, you should specify the hinge placement (ie. left or right) viewed from therear of the gate.
  • Ensure the ground and any existing structure to which the gate is be installed is sound and suitable forapplication prior to ordering.
 

Please ensure the details you provide are as accurate as possible as your gates will be manufactured to the specifications you provide. If you would like some help or a site survey we have a network of agents around the UK who we can call on your behalf for a visit. Should you have any questions, please don't hesitate to call us on 01952 292852 or 293737

Fitting instructions
Bespoke Single and Double gates

  • Offer the gate up into the gap.
  • Place a spacer or wedge under the gate for ground clearance (usually about 25mm/1")
  • Insert the bottom hinge into the locating hole on the gate.
  • Mark the position of the hinge onto the wall or post and drill an 8mm hole.
  • Place gate into position, making sure that the grub screw nearest the panel is tightened first. Insert top hinge into locating hole.
  • Check that the hinges are vertical to one another using a spirit level.
  • Drill the holes marked up for the top hinge using an 8mm drill bit.
  • Split the hinges using a 5mm allen-key, then secure the hinges to the wall using the Hex head boltsprovided.
  • Replace the pin section of the hinge back into the locating holes on to the gate and slide the gate onto thehinge base plate.
  • Tighten the grub screws nearest the gate first, so that the gate is held in position
  • Repeat the process if fitting double gates ensuring that the gates are aligned at the top.
  • Adjust the hinges to suit an even gap.
  • Secure the catch to the angle with the supplied fixings (the catch fits on the small face of the angle)
  • Using the lock as a locator, position the catch to the wall/post using the screws provided. (In the case ofdouble gates, the catch fits on the side of the opposite gate)
  • Fit the catch cover and secure with retaining screw
  • Fit the spring bolt to the bottom of the vertical aluminium frame on both gates using a 3mm drill bit & fix withscrews provided.
  • If needed the hinges can be adjusted for a perfect fit.
  • Side strips can be fitted to the side of the post in front of the gate so as to hide any gaps, making sure thatthere is enough clearance for the gate to open.
 

If you experience any difficulty in fitting your gate, please do not hesitate to contact the office on 01952 292852 where we will be happy to assist you further.

Fitting instructions
Standard gates
  • Offer post up to the wall
  • Level post. Then using a 10mm masonry drill bit, drill through the post and the wall.
  • Secure post with the 3 window fixings supplied.
  • Clip the blanking strip into the slot of the post.
  • Place the post cap on top of the post.
  • Repeat the process of fixing the other post, making sure it is aligned with the first post.
  • When inserting the timber insert into the post, make sure it is facing inwards.

Option 1

  • Secure the top hinge to the front face of the gate, making sure that the hinge is in line with the rails on theback of the gate, using the screws supplied.
  • Repeat for the bottom hinge.
  • When hanging the gate, leave approx. 50mm gap between the gate and the ground.
  • Offer the gate up to the post.
  • Attach to post with screws supplied.
  • Fit latch and handles to gate
  • Close gate onto other post.
  • Align alu block spacer and catch, making sure latch engages properly.
  • Then fix the catch and alu block using the screws supplied.

Option 2

  • Secure the top hinge to the rail, making sure the hinge protrudes past the edge of the gate.
  • Attach using screws supplied.
  • Repeat for bottom hinge.
  • When hanging the gate, leave approx. 50mm gap between the gate and the ground.
  • Offer the gate up between the 2 posts.
  • Attach to post with screws supplied.
  • Fit latch and handles to the gate.
  • Close the gate and align catch to latch bar, making sure the latch engages properly
  • Fix the catch using the screws supplied.

With extension panel